Replacing every window in a house is a big project. Many homeowners wonder whether to do it all at once or spread it over two or three years. Both can be sensible. This guide covers the trade-offs so you can choose, then price both plans with the online estimator.
Price the whole house, then each phase
Build your full window list in the estimator, then price just the first phase to see the difference.
Why doing it all at once often costs less per window
- Fewer trips: setup, travel and clean-up are spread across more windows.
- One order: manufacturers and installers price larger orders more efficiently, and some companies offer better pricing on whole-house jobs.
- One disruption: the house is open for a few days once, not several times.
- Consistent look: every window matches in brand, colour and sightlines.
Why phasing can still make sense
- Budget: spreading cost over two or three years can avoid financing.
- Priority: some windows are failing (fogged glass, rot, broken hardware) while others are fine.
- Other projects: if you plan to re-side or renovate one side of the house, it can make sense to do those windows with that job.
How to phase well
Start with the worst windows
Fogged glass, soft or rotting frames, drafts you can feel, and windows that no longer lock should go first. Our cost guide has more on what drives window replacement cost.
Do one side or one elevation at a time
Doing the whole front of the house in one phase keeps the street view consistent. Windy north and west sides are often the best first phase for comfort.
Lock in the product
Write down the brand, series, glass package, colour and grille pattern from phase one, so later phases match. Colours in particular can differ between brands; see painted window colour cost.
Price the whole house first
Even if you phase, get a whole-house price so you know the full budget and can see what each phase costs. Ask whether the company will hold its pricing for later phases.
Energy and comfort
New windows improve comfort room by room, so phasing still gives real benefits in the rooms you do first. The full gain in airtightness comes when every opening is done.
Rebates and programs
Government energy programs change often, and some require an energy assessment before work starts. Check current program rules before you begin, especially if you plan to phase the work. Our page on the home energy assessment explains how assessments work.
Timing through the year
Windows can be installed in any season in the Ottawa area. Installers replace one opening at a time, so each room is only open for a short period, even in winter. Spring and fall are the busiest seasons, and lead times for custom windows can be longer then. If you are phasing, booking the next phase in a quieter month may shorten the wait. Order early if you want work finished before a specific date.
A simple decision rule
If most windows are original and of the same age, pricing the whole house at once usually gives the best result. If only a few are failing, replace those now and plan the rest. Either way, compare quotes on the same window list; our quote comparison checklist helps.
Local pages for window replacement in Kanata, window replacement in Orléans and window replacement in Barrhaven describe common window ages and styles in those neighbourhoods.
See both plans in dollars
Enter every window once, then compare installed quotes from several window companies for the whole house or just phase one.
Frequently asked questions
Is it cheaper to replace all windows at once?
Usually per window, yes. Setup, travel and ordering costs are spread over more windows, and some companies price whole-house jobs better.
Which windows should I replace first?
Start with failing windows: fogged glass, rot, drafts or broken locks. North and west walls are often the best first phase for comfort.
Will new windows match the old ones if I phase the work?
They can if you record the brand, series, glass, colour and grille pattern and use the same product for each phase.
Can I get a price for only some of my windows?
Yes. In the estimator, enter your full list and then price only the windows in your first phase.